small waste incinerator for ZAMBIA model YD30C
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]
| Items | Specification | |||
| YDC Model | YD-10C / YD-20C / YD-30C / YD-50C | |||
| Main Product List | Primary Combustion Chamber | |||
| Secondary Combustion Chamber | ||||
| Mix Combustion Chamber | ||||
| Smoke Filter Chamber | ||||
| Incinerator Common Control Case | ||||
| Stainless Steel Chimney | ||||
| Italy oil/gas burner: 02 units | ||||
| Oil Tank (if oil fuel) | ||||
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Tel: +86-25-8461 0201
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]
| Items/Model | YD-10C | YD-20C | YD-30C | YD-50C |
| Burning Rate (kgs/Hour) | 10 kgs/Hr. | 20 kgs/Hr. | 30 kgs/Hr. | 50 kgs/Hr. |
| Feed Capacity (kgs) | 40 kgs | 40 kgs | 50 kgs | 80 kgs |
| Equipment Weight | 2100 kgs | 2100 kgs | 2300 kgs | 2500 kgs |
| Primary Chamber (Liters) | 200 | 200 | 250 | 400 |
| Secondary Chamber (Liters) | 140 | 140 | 140 | 140 |
| External Dimensions (cm) | 170x140x160 | 170x140x160 | 170x140x190 | 180x160x200 |
| Internal Dimensions (cm) | 55x55x65 | 55x55x65 | 55x55x85 | 70x70x85 |
| Oil Tank(Liters) | 50 | 100 | 100 | 150 |
| Door Opening (cm) | 38 x 48 | 38 x 48 | 38 x 48 | 45×55 |
| Chimney (M) | 5 | 5 | 5 | 5 |
| Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
| Secondary Chamber | YES | YES | YES | YES |
| Mix-Combustion Chamber | YES | YES | YES | YES |
| Smoke Filter Chamber | YES | YES | YES | YES |
| Combustion Fuel | Oil/Gas | Oil/Gas | Oil/Gas | Oil/Gas |
| Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
| Temperature Monitoring | YES | YES | YES | YES |
| 1st. Chamber Temperature | 800℃–1000℃ | 800℃–1000℃ | 800℃–1000℃ | 800℃–1000℃ |
| 2nd. Chamber Temperature | 1000℃-1200℃ | 1000℃-1200℃ | 1000℃-1200℃ | 1000℃-1200℃ |
“A digital weighing scale is needed to accurately weigh the wastes before entering the sterilizer. All the
? Durable construction with Stainless Steel Platter
? Bidirectional RS-232 data interface
? Easy-to-read 1″” / 25.4 mm high LCD Display with Backlight
? Weighing units conversion through keypad: kg, lb, oz, counting
? Auto zero tracking
? Stability and low battery indicator
? Overload and underload indication
? Auto off (battery)
? Power: AC/DC Adaptor 12VDC Operating Temp.: 5-35 °C. Digital indicator can be wall mounted and is
“
Truck cleaning set
A basic truck cleaning system shall be offered, consisting of a supply of surface disinfection chemicals,
The knapsack sprayer shall be of daily commercial use type and come with standard accessories: Pivoting
The high-pressure cleaner shall be delivered with the cleaning equipment. Power supply shall
Radiation detector
“A mobile, hand-held radioactive detector shall be supplied to check the radioactive wastes in the medical wastes
“
It should have two electrodes and be able to be adjusted according to beta and gamma rays and it must
Monitoring package
A one year supply of monitoring equipment and consumables for monitoring shall be supplied together
300 biological spore test (Bacillus Stearothermophilus) and one incubator for spore test (55°C).
52 standard Bowie Dick test set (non-reusable) for the test of successful air removal (only if the
Personal Protection Equipment
Sets of PPE designed for the working with bio-hazardous materials (Risk level I to III) shall be provided. Each set shall include at least: one pair
The needle stick proof gloves shall be made with a Nitrile Butadiene coating (water repellent)
Sets of PPE designed for the working with steam treatment plants shall be provided. Each set shall
“Heat resistant gloves, Made from Kevelar, Application: Personal Protection Equipment for
? High heat resistant
? Good protection against cuts
“
Waste disposal equipment
Cart-Hydraulic loader (hydraulic operated bin lift-tip device)
“External, moblile lift tipping device with a control system. Must come with a hydraulic
“
“Width x Depth x Height: about 2 x 1.8 x 3.4 m
Minimum lifting capacity 500 kg
Electrical Data >2 kW
220�C240 V/50Hz
Tilting Height >1.7 m”
Waste Skip (5,5 m3)
“Waste Skip (container) with 2 hatches
Volume: 5,5 m3, Liquid proof
Built in accordance with DIN 30720
Materials
Bottom �C Mild steel – 5mm
Sides �C Mild steel, 4mm
Hatch �C Mild steel- 2,5 mm.
Reinforcement RSC 76mm x 38mm x 6.7kg/metre
Lifting Lugs: 4 no Shepperd Meiler type manufactured skip lugs welded through both the
Tipping Bars 35 mm mild steel tipping bar with FLT6 mm pressed plate supports
Hatches to be fitteld with a detachable handle to ease opening, each hatch shall be fitted
One coat primer, two coats finishing enamel in colour of your choice.
Anticorrosion protection: One coat primer, two coats finishing enamel in light green (RAL)
Each dump hatch shall be equipped with a spring for facilitating opening
Containers should be equipped with effluent grate with drain valve. “
Deposit Tipper Truck
“Truck:
Should have a wheel base of >2750 mm.
Load capacity >5 tons
Cabin type: single cabin
Engine capacity: >100 Kw, Fuel type: Diesel
Gearbox kind: Manual, Number of Gears: 5
Power steering: yes
Number of seats: 2 with appropriate seat belts, with Sun Visor
Cloth Seat Covers and rubber floor mats (ruffnuts).
Front & rear mud flaps.
Lockable fuel cap, factory type where applicable.
Should come with an Hour meter.
Spare tyre and rim. jack, wheel brace and spanner. A spare tyre carrier is also to be fitted.
Provide two (2) amber revolving lights, both to be fitted permanently on cabin or roof bar. “
“Deposit tipper mounting:
For carriages up to 3 tons total weight to transport skips ranging from 1.5 to 7 cbm.
Compact design for good manoeuvrability.
The system should work with two separately operated rotating arms and a telescoping
Expansion to the left and to the right should be separately operated, skip should be
Should come with two built in front stoppers which secure the skip to the front.
An additional securing with straps or chains should not be necessary.”
Other Works
Supply, install and operate Ventilation Works:
A complete washable aluminum centrifugal fan with its own electric motor, vibration stoppers,
A complete washable axial exhaust fan with rain protective cover and its own electric motor,
0.7 mm galvanized iron sheets air passages with controllers according to specifications and industry standards.
Un-painted Aluminum air outlets with the dimensions shown in the drawings and according to technical specifications.
Supply and install a cold storage room
“Supply and install a modular storage cold room including cooling system with a size of about 4m x 6m
“
“The exterior height of the room including floor and ceiling panels shall be 2000 mm. Corner panels
The polyester thickness shall be minimum 25mm and with a smooth finish for ease of cleaning.
“Floor panels shall be same as wall panels with the addition of marine plywood surface coated with a non-slip glass fibre resin suitable for pedestrian traffic and trolleys with rubber wheels. Floor panels
Insulation Factors:
Each panel shall be completely filled with rigid CFC/HCFC Free polyurethane foam to a density
A. Coefficient of thermal conductivity of gn = 0.024 w/mk
B. Coefficient of thermal expansion n.70 x 10-6/k
C. Water vapour transmission rate (0,1…1,2) x 10-12kg m/m2 sPa
D. Water absorbency in 100% relative humidity max. 0.2 volume%
Overall thickness of each panel is 100mm. “
“The assembly of the cold room shall be accomplished by excentric action cam lock panel fasteners.
The cold room shall be equipped with one (1) semi-rebated hinged door complete with heavy
“The room shall be fitted with an on-board air cooled refrigeration system capable of holding waste at the required temperature of
The refrigeration system should use environmentally friendly refrigerants. The unit shall also be
Civil Works:Execute all the civil works according to specifications:
Reinforced concrete for the hall floor, including a layer 15cm thick of plane concreted and stone.
Supply and install an epoxy-insulating layer on the hangar-lab floor at the rate of 0.5 litre/m2 over the
Plastering work according to specifications
Supply and install ceramic tiles similar to the existing one for the walls of the hangar in accordance to specifications.
Supply, install, operate, testing and handing over the electrical works including all work requirements
An armed copper ground cable (7x240mm2+1x240mm2) extending from the transformer to the main board.
Ditto, but cross section (4x70mm2+25mm2)
Ditto, but cross section (4*70mm2)
Ditto, but reinforced with the cross section (4*25mm2 + 16mm2)
Ditto, but normal with the cross section (4*25mm2 + 16mm2)
Ditto, but normal with the cross section (4*16mm2+10mm)
Ditto, but reinforced with the dimension (4*16mm2+10mm)
Armed copper ground cable (4×10 + 6mm2) for lightening the site and the fences.
A complete earthing system
Supply, install and operate a main distribution board with 10 lines, 800 ampere equivalent to Legerand type or
One (800 A) 3 Ph MDB
One (2×160 A) 3 Ph Branch C.P.
Two (2×100 A) 3 Ph Branch C.P
Four (4×63,3 A) 3 Ph Branch CP
The contact breakers shall be of the MCCB type.
A normal 80 Watt 50 cm dangling lamps from the roof
125-Watt halogen down light systems, with an arm, and an internal and external wall base.
35 cm-diameter fans for drawing air out at the café and WCs
15 Ampere 220 V 3-openings electric socket with switch
20 Ampere 220 Volts electric socket with a red indicator
Supply and install a telephone socket at the hall and management room
Supply, install and operate a fire alarm and fire fighting system including all parts and accessories required to
A sensitivity scalable T type Ionization smoke detector that works in air-conditioned and non-conditioned
A heat detector that is sensitive to the rapid rise of temperature and can work with a stable pre-determined
A sirne should be installed to work automatically through the detectors and the volume level can be varied
A break glass according to the drawing and specifications.
A fire alarm control pannel complete with cables in reinforced pipes.
Fire fighting foam in full 25kg containers with carrying wheels of a guaranteed source with all accessories
Fire fighting dry powder in full 6kg containers, of a guaranteed source complete with carrying frame and all accessories
Telecommunication: To connect the office building to the telephone network and to install one switchboard for at least 2 lines.
Operate and maintain the whole plant for one month including training the management local staff on




